Mechanism of How it Works. |
Twelve metres long, the bridge is made in eight steel and timber sections, and is made to curl by hydraulic rams set into the handrail between each section.
The bridge consists of eight triangular sections hinged at the walkway level and connected above by two-part links that can be collapsed towards the deck by hydraulic cylinders, which are concealed in vertical posts in the bridge parapets. When extended, it resembles a conventional steel and timber footbridge, and is 12 metres long. To allow the passage of boats, the hydraulic pistons are activated and the bridge curls up until its two ends join, to form an octagonal shape measuring one half of the waterway's width at that point.
The maintenance and opening of the bridge is managed by Merchant Square Estates and it is up every Friday at noon. Following on from the maintenance issues in 2008, the bridge has been repaired and was fully operational from April 2009.